Two weeks after heavy rain caused soil, clay and trees to slide down an embankment and on to the tracks near Aldridge, the line is re-opened to rail traffic, albeit at reduced speed near to the worksite. Compare this tree-less scene to those posted on the 15th June. Photo by Jago.
2 comments:
Looks like the Birch Branch has been double tracked!
Mad comparison
Post a Comment