
The up Sutton Park line trackbed (seen on the right) has been lowered a few inches during recent engineering work, presumably to allow the safe passage below bridges of 9' high containers on freightliner trains.
I expect the down line will follow suit next week....
1 comment:
Shame the line speed won't be increased. It used to be 90mph in the ,60s!
Progress?
Post a Comment